You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
if i have two concepts each running 10 threads (in the same PS Session)
is it possible to allow one to have have a different throttle limit than the other?
or is -Throttlelimit across all thread jobs
for instance Jobs 1-10 have Codeblock $A to do, and each has been given a jobname of "A" for ease of tracking. They are very important, and should always have 4 threads to work on them. They however share a WebSession with the parent and all the Jobs 11-20. So they can't easily be run in different hosts.
Jobs 11-20 have Codeblock $B to do, and each has been given a jobname of "B" for ease of tracking. they are not nearly as important and should only have 2 threads ever working on their work.
if i set throttle limit to 4 when creating Jobs 1-10, and then throttle limit 2 when creating jobs 11-20, i assume the results is the initial 4 jobs begin, but then the max current running jobs scale back to 2, processing all the jobs in 1-10 then 11-20 generally 2 at a time (depending on how many finished before 11-20 were defined)
Is there a way I can set the throttle limit per ... something (Name seems the best to me, but a new parameter like JobGroup etc. would add functionality without damaging current expectations)
The text was updated successfully, but these errors were encountered:
if i have two concepts each running 10 threads (in the same PS Session)
is it possible to allow one to have have a different throttle limit than the other?
or is -Throttlelimit across all thread jobs
for instance Jobs 1-10 have Codeblock $A to do, and each has been given a jobname of "A" for ease of tracking. They are very important, and should always have 4 threads to work on them. They however share a WebSession with the parent and all the Jobs 11-20. So they can't easily be run in different hosts.
Jobs 11-20 have Codeblock $B to do, and each has been given a jobname of "B" for ease of tracking. they are not nearly as important and should only have 2 threads ever working on their work.
if i set throttle limit to 4 when creating Jobs 1-10, and then throttle limit 2 when creating jobs 11-20, i assume the results is the initial 4 jobs begin, but then the max current running jobs scale back to 2, processing all the jobs in 1-10 then 11-20 generally 2 at a time (depending on how many finished before 11-20 were defined)
Is there a way I can set the throttle limit per ... something (Name seems the best to me, but a new parameter like JobGroup etc. would add functionality without damaging current expectations)
The text was updated successfully, but these errors were encountered: