Skip to content

Latest commit

 

History

History
36 lines (32 loc) · 1.28 KB

Timeline.md

File metadata and controls

36 lines (32 loc) · 1.28 KB

Timeline

Week 1

  • Idea for capstone
  • Product hardware research
  • Product software/API research
  • Deliverable October 2nd: Idea

Week 2

  • Nail down hardware
  • Play with API or sound equalizer transformations
  • Deliverable October 9th:
    • product plan
    • lights on order (done)
    • microprocessor on order (done)
    • any adapters/shields (wifi/bluetooth) on order (done - all-in-one so unneccessary)

Week 3

  • x eta for microprocessor is Monday
  • x LEDs will also probably be delivered sometime this week
  • x begin work with Echo Nest API or sound algorithms
  • determine how going to get name/artist from spotify to spit out segment data
  • x do baby step microprocessor + LEDs project to get feet wet
  • Deliverable October 16th:
    • Software: rough draft munging short music notes or chords into dots on screen representing LEDs
    • x Hardware: test out microprocessor and bluetooth functionality, and lights if available

Week 4

  • begin to incorporate LEDs into the mix
  • Deliverable October 23rd:
    • x Ability to show LEDs lighting up when microcontroller directly plugged into laptop
    • x Serial communication with LEDs and python program

Week 5 - Final Week

  • Work with bluetooth communcation
  • Deliverable October 30th:
    • Final product for demo