Skip to content

Update dependency Arch Linux Base to v2025 #559

Update dependency Arch Linux Base to v2025

Update dependency Arch Linux Base to v2025 #559

Triggered via push January 2, 2025 03:22
Status Failure
Total duration 1m 25s
Artifacts

test.yml

on: push
Matrix: test
finalize
4s
finalize
Fit to window
Zoom out
Zoom in

Annotations

9 errors
[0/5] Integration
Process completed with exit code 2.
[2/5] Integration
Process completed with exit code 2.
[1/5] Integration
Process completed with exit code 2.
[4/5] Integration
The job was canceled because "Integration_1_5_0" failed.
[4/5] Integration
Process completed with exit code 2.
[3/5] Integration
The job was canceled because "Integration_1_5_0" failed.
[3/5] Integration
Process completed with exit code 2.
[0/1] Mock
The job was canceled because "Integration_1_5_0" failed.
[0/1] Mock
The operation was canceled.