Added documentation for Phase Switching
Browse files Browse the repository at this point in the history
Signed-off-by: Piet Gömpel <[email protected]>
  • Loading branch information
Pietfried committed Jan 17, 2025
1 parent 926c187 commit e646c12
Showing 1 changed file with 43 additions and 0 deletions.
43 changes: 43 additions & 0 deletions modules/EnergyManager/doc/index.rst
Original file line number Diff line number Diff line change
Expand Up @@ -509,6 +509,49 @@ The EnergyManager module implements an algorithm to distribute available power t
* The algorithm prefers charging over discharging if the specified limits allow for both
* It supports phase switching between single-phase and three-phase modes, optimizing power usage for low-demand scenarios if **switch_3ph1ph_while_charging_mode** is enabled.

Phase Switching
===============

This module supports switching between single-phase (1ph) and three-phase (3ph) configurations during AC charging.

.. warning::

Some vehicles (such as the first generation of Renault Zoe) may be permanently damaged when switching from 1ph to 3ph during
charging. Use at your own risk!

To use this feature, several configurations must be enabled across different EVerest modules:

- **EvseManager**: Adjust the following configuration options to your needs:
- ``switch_3ph1ph_delay_s``
- ``switch_3ph1ph_cp_state``
- **Module implementing the `evse_board_support <../interfaces/evse_board_support.yaml>`_ interface:**
- Set ``supports_changing_phases_during_charging`` to ``true`` in the reported capabilities.
- Define the minimum number of phases as 1 and the maximum as 3.
- Ensure the ``ac_switch_three_phases_while_charging`` command is implemented.
- **EnergyManager**: Adjust the ``switch_3ph1ph_while_charging_mode`` configuration option to your requirements.

If all of these are properly configured, the EnergyManager will handle the 1ph/3ph switching. To enable this, an external limit must be set.
There are two ways to configure the limit:

1. **Watt-based limit (preferred option):** The limit is set in Watts (not Amperes), even though this involves AC charging. This provides
the EnergyManager with the flexibility to decide when to switch. The limit can be defined by an OCPP schedule or through an additional
EnergyNode.
2. **Ampere-based limit:** The limit is defined in Amperes, along with a restriction on the number of phases (e.g., ``min_phase=1`` and
``max_phase=1``). This enforces switching and allows external control over the switching time, but the EnergyManager loses its ability to
choose when to switch.

Best Practices
^^^^^^^^^^^^^^

In general, this feature works best in a configuration with 32A per phase and a Watt-based limit. In this setup, there is a hysteresis
because the single-phase and three-phase charging intervals overlap:

- Single-phase charging: 1.3kW to 7.4kW
- Three-phase charging: 4.2kW to 22kW (or 11kW)

If the intervals do not overlap, there is no hysteresis. Be aware that some vehicles support 32A on 1ph but are limited to 16A on 3ph.
Others may be limited to 16A in 1ph mode, resulting in slower-than-expected charging in 1ph mode.

Current Limitations
-------------------

Expand Down