tests: os: swap: increase wiggle room in swap check #1349
Annotations
3 errors
Yocto / Build
Canceling since a higher priority waiting request for 'Revolution Pi Connect 4-ryan/swap-revpi-connect-4-balena-staging.com' exists
|
Yocto / Build
The operation was canceled.
|
Yocto / All jobs (revpi-connect-4, balena-staging.com)
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-logs
Expired
|
27.5 MB |
|