WIP: unreachable? #908
linux-bazel-builds.yml
on: push
Matrix: Linux Ubuntu 22.04 Bazel build <GCC 11.2.0>
Annotations
5 errors
Linux Ubuntu 22.04 Bazel build <GCC 11.2.0> (dbg)
Process completed with exit code 1.
|
Linux Ubuntu 22.04 Bazel build <GCC 11.2.0> (fastbuild)
The job was canceled because "dbg" failed.
|
Linux Ubuntu 22.04 Bazel build <GCC 11.2.0> (fastbuild)
The operation was canceled.
|
Linux Ubuntu 22.04 Bazel build <GCC 11.2.0> (opt)
The job was canceled because "dbg" failed.
|
Linux Ubuntu 22.04 Bazel build <GCC 11.2.0> (opt)
The operation was canceled.
|