Skip to content

chore(deps): update dependency @sveltejs/vite-plugin-svelte to v5 #1706

chore(deps): update dependency @sveltejs/vite-plugin-svelte to v5

chore(deps): update dependency @sveltejs/vite-plugin-svelte to v5 #1706

Triggered via pull request November 29, 2024 13:08
Status Failure
Total duration 37s
Artifacts

linux.yml

on: pull_request
Matrix: nodejs
Matrix: perl
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 warnings
nodejs (18)
Process completed with exit code 1.
perl (5.20)
Docker pull failed with exit code 1
perl (5.34)
The job was canceled because "_5_20" failed.
perl (5.34)
The operation was canceled.
perl (5.20)
Docker pull failed with exit code 1, back off 9.959 seconds before retry.
perl (5.20)
Docker pull failed with exit code 1, back off 8.005 seconds before retry.