Skip to content

Updated the size

Updated the size #36

Triggered via push December 17, 2024 16:08
Status Failure
Total duration 41s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 4 warnings
build (Pharo64-11)
Process completed with exit code 1.
build (Pharo64-9.0)
The job was canceled because "Pharo64-11" failed.
build (Pharo64-9.0)
Process completed with exit code 1.
build (Pharo64-10)
The job was canceled because "Pharo64-11" failed.
build (Pharo64-10)
Process completed with exit code 1.
build (Pharo64-11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (Pharo64-11)
Please use "smalltalk-image". "smalltalk-version" is deprecated and will be removed in the future.
build (Pharo64-9.0)
Please use "smalltalk-image". "smalltalk-version" is deprecated and will be removed in the future.
build (Pharo64-10)
Please use "smalltalk-image". "smalltalk-version" is deprecated and will be removed in the future.