A R script that calculates the buoyancy work required to bring a parcel of water from different depths (zint) to a reference depth (z2=-10 m). It is considered a resting ocean and that the plot in zint is in hydrostatic equilibrium. The vertical discretization of the vertical profile can be non-equidistant.
-
Notifications
You must be signed in to change notification settings - Fork 1
Calculates the buoyancy work required to bring a parcel of water from different depths to a reference depth
License
moreles86/buoyancy_potential_work
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
About
Calculates the buoyancy work required to bring a parcel of water from different depths to a reference depth
Resources
License
Stars
Watchers
Forks
Packages 0
No packages published