Skip to content

v16.0.1

v16.0.1 #2676

Triggered via push December 12, 2024 08:50
Status Failure
Total duration 3m 18s
Artifacts

test.yml

on: push
Matrix: E2E Tests
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 4 warnings
E2E Tests (20, windows-2019)
Process completed with exit code 1.
E2E Tests (18, windows-2019)
The job was canceled because "_20_windows-2019" failed.
E2E Tests (18, windows-2019)
The operation was canceled.
E2E Tests (18, ubuntu-latest)
The job was canceled because "_20_windows-2019" failed.
E2E Tests (18, ubuntu-latest)
The operation was canceled.
E2E Tests (18, macos-latest)
The job was canceled because "_20_windows-2019" failed.
E2E Tests (18, macos-latest)
The operation was canceled.
E2E Tests (20, ubuntu-latest)
The job was canceled because "_20_windows-2019" failed.
E2E Tests (20, ubuntu-latest)
The operation was canceled.
E2E Tests (20, macos-latest)
The job was canceled because "_20_windows-2019" failed.
E2E Tests (20, macos-latest)
The operation was canceled.
Lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Lint: __e2e__/init.test.ts#L156
Disabled test
Unit tests (20)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Unit tests (18)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636